Matte-black 40-yard roll-off dumpster staged on a framed-out residential construction site in Allentown, framing lumber stacked nearby, hooklift delivery truck visible in the background under bright Colorado daylight

Construction dumpster rental in Allentown

Need a roll-off for your Allentown jobsite? A 20-yard container keeps small crews moving; swap-outs scheduled same-day avoid delays—just ask for driveway boards when you call.

Jobsite Roll-off Containers for General Contractors

Our construction fleet runs 20-, 30-, and 40-yard roll-offs across the Allentown metro and Lehigh. Each container features reinforced steel sidewalls, walk-in rear swing doors, and steel bottom rollers for framers, roofers, and demo crews. We set every bin on driveway boards to protect your site. Reach out for contractor pricing and tonnage rates regarding recurring service for multi-phase projects. Call (484) 302-0552.

Matte-black 20-yard roll-off construction dumpster with heavy ribbed steel sidewalls and swing rear doors at a working jobsite in Allentown, sitting directly on compacted dirt with an unmarked white hauler partially visible at the far edge of the frame.

20-yard construction roll-off

A 20-Yard Roll-Off Container measures 20 ft long, 7 ft wide, 4 ft tall, holding 2 tons in the flat rate.

This 20-yard roll-off fits kitchen and bath remodels, single-room demo, and small framing jobs in Allentown.

Matte-black 30-yard roll-off construction dumpster sitting directly on the compacted-dirt site of a framed single-family home build in Allentown, drywall and lumber scrap loaded inside.

30-yard construction roll-off

The 30-yard roll-off runs 22 feet long, 8 feet wide, and 6 feet tall, with about 4 tons included for your debris.

The 30-yard container fits whole-house remodels, additions and new-build framing with high walls for bulky drywall and lumber.

Matte-black 40-yard roll-off construction dumpster being lowered from a white-cab hooklift delivery truck onto the compacted-dirt jobsite at a commercial build site in Allentown

40-yard construction roll-off

The 40-Yard Roll-Off stretches 22 ft long by 8 ft wide and 8 ft tall, with 5 tons of debris included.

Sized for commercial builds and large tear-outs, the 40-yard container remains the largest roll-off for multi-phase projects in Allentown.

Construction Debris, Drywall, Lumber Acceptance

Construction projects produce a lot of waste that our roll-off containers handle. We take mixed C&D debris: framing lumber, drywall, plaster, subfloor, insulation, packaging, pallets, and light metals. Everything gets sorted at the Allentown transfer station to improve recovery—refer to EPA construction debris recycling guidance for details. Contractors on active job sites often set up commercial recurring hauling agreements to manage this process.

  • Framing lumber and offcuts
  • Drywall, plaster, lath
  • Subfloor and sheathing
  • Insulation and vapor barrier
  • Mixed packaging and pallets
  • Light metals and conduit
Worker in a yellow high-visibility vest tossing framing lumber and broken drywall into a matte-black 30-yard construction roll-off dumpster on an active build site in Allentown, bright daylight
Low-profile matte-black lowboy roll-off dumpster loaded with broken concrete slab and rebar at a foundation tear-out in Allentown, skid steer parked beside it, sunny Colorado morning

Concrete, Brick, and Asphalt Heavy-debris Pricing

Dense materials like concrete slab tear-out, brick demo, asphalt millings, and clean dirt need a heavier-duty container. Our reinforced-steel lowboy roll-offs are built for these loads up to 10,000 pounds on a single run. The low 2-to-3-foot side walls let skid steers and wheelbarrows dump straight in without pushing past USDOT truck weight limits on Allentown routes.

Heavy-debris jobs run on weight tickets from the scale house, not on the yard; the cleanest loads — with no mixed wood, drywall, or trash in them — earn the lowest per-ton rate. You call the site super to coordinate, and we dispatch the container or dumpster based on the expected tonnage.

Tonnage Limits and Weight Overage Policy

Every construction roll-off ships with a set tonnage allowance: the weight cap is listed clearly on your upfront quote. Additional weight is billed at the per-ton overage rate verified by the scale-house ticket—and that means no surprises when the truck weighs in. For a heavy roofing tear-off jobsite containers are priced separately, so shingles do not eat your mixed-debris allowance. Call (484) 302-0552.

20-yard

3 tons

Included tonnage. Mixed C&D debris.

30-yard

4 tons

Included tonnage. Mixed C&D debris.

40-yard

5 tons

Included tonnage. Mixed C&D debris.

On-site Swap-out and Dispatch Coordination

For multi-week jobs it’s a swap-out rhythm, not a single drop; text or call dispatch when the container’s full — and we’ll roll a fresh roll-off to the same staging pad the same or next business day across the Allentown metro and Lehigh.

Step 1

Text dispatch when full

Site supers text a photo and the container number to the dispatcher — no portal logins, no ticketing.

Step 2

Same- or next-day swap

We haul your full container and drop an empty on the same pad so no loading hour is lost.

Step 3

Weekend dispatch available

Saturday pulls keep Monday starts clean; Friday afternoon coordination sets the pace.

Insurance and Contractor Account Setup

General contractors and homeowners get certificates of insurance issued right away; we run net-30 contractor accounts with consolidated monthly billing for active sites across Allentown — the hooklift fleet stages the recurring containers. The dispatcher sets up the account in one call, no paperwork shuffle.